Roadwork on section of St. Clair Road in Idaho Falls resumes Friday

Trending 3 weeks ago
ARTICLE AD BOX

The pursuing is simply a news merchandise from nan metropolis of Idaho Falls.

IDAHO FALLS – Contractors will beryllium backmost connected St. Clair Road to supply entree to manholes and h2o valves connected Friday, Sept. 6, arsenic portion of nan asphalt overlay project.

Lane closures will beryllium successful spot on St. Clair Road betwixt East 17th Street and East 25th Street to complete nan work. Traffic will still beryllium capable to recreation successful some directions, but lane widths will beryllium reduced.

The activity should beryllium completed by nan extremity of adjacent week.

A pavement overlay is simply a caller furniture of pavement placed complete nan existing thoroughfare pavement. To complete this process, contractors mill retired a apical furniture of roadworthy aboveground earlier applying nan caller pavement. Having nan manholes and h2o valves level pinch nan caller roadway is basal to guarantee drivers person a soft aboveground connected which to travel.

The pavement overlays are among nan Public Works Department’s ongoing attraction efforts for streets crossed nan city. For a afloat database of building projects, position nan city’s interactive building representation HERE.

Please trim speeds, obey posted postulation power signage, and watch for building crews passim nan activity zones.

More
Source east idaho news
east idaho news